Useful Information
Our Bank Details
Tide Bank - Frappah Construction (if your bank does not recognise the Tide account name Frappah Construction, please use my name Stephen Corbett. We have experienced a few issues from some banks but not all, so please try both account names if one fails on first attempt to set up as a new payee) - account no. 22702663 - sort code. 04-06-05.
Please do contact me if you have any concerns and I will explain in more detail.
Our Mission
Is to provide a service that equals, or better still exceeds, what you are hoping for. Decades of experience in all aspects of design, construction and project management, along with a varied team of qualified and experienced tradesmen and women, will bring these skills and their abilities together to undertake and complete your project and bring your visions to life.
Planning Permission
You’ll probably need planning permission if you want to:
-
build something new
-
make a major change to your building, such as building an extension
-
change the use of your building
To find out if your project will need planning permission, contact your local planning authority (LPA) through your local council.
If your project needs planning permission and you do the work without getting it, you can be served an ‘enforcement notice’ ordering you to undo all the changes you have made.
Building Regulations
Building regulations approval is different from planning permission. You might need both?
Nearly all extensions and loft conversions, garage conversions and some internal alterations will require building regulations approval.
Work covered by building regulations
The Building Regulations 2010 cover the construction and extension of buildings.
You might also need building regulations approval for many alteration projects, including if you plan to:
-
replace fuse boxes and connected electrics
-
install a bathroom that will involve plumbing
-
change electrics near a bath or shower
-
put in a fixed air-conditioning system
-
replace windows and doors
-
replace roof coverings on pitched and flat roofs
-
install or replace a heating system
-
add extra radiators to a heating system
Building Regulations and Approved Documents index
Approved Documents
Structure: Approved Document A
1 September 2013 Statutory guidance
Fire safety: Approved Document B
29 March 2024 Statutory guidance
Site preparation and resistance to contaminates and moisture: Approved Document C
3 September 2013 Statutory guidance
Toxic substances: Approved Document D
2 December 2010 Statutory guidance
Resistance to sound: Approved Document E
4 March 2015 Statutory guidance
Ventilation: Approved Document F
15 June 2022 Statutory guidance
Sanitation, hot water safety and water efficiency: Approved Document G
15 May 2024 Statutory guidance
Drainage and waste disposal: Approved Document H
4 December 2010 Statutory guidance
Combustion appliances and fuel storage systems: Approved Document J
30 September 2022 Statutory guidance
Protection from falling, collision and impact: Approved Document K
3 January 2013 Statutory guidance
Conservation of fuel and power: Approved Document L
2 February 2023 Statutory guidance
Access to and use of buildings: Approved Document M
15 May 2024 Statutory guidance
Overheating: Approved Document O
15 June 2022 Statutory guidance
Electrical safety: Approved Document P
1 January 2013 Statutory guidance
Security in dwellings: Approved Document Q
5 March 2015 Statutory guidance
Infrastructure for electronic communications: Approved Document R
4 October 2022 Statutory guidance
Infrastructure for charging electric vehicles: Approved Document S
17 April 2023 Statutory guidance
Toilet accommodation: Approved Document T
15 May 2024 Statutory guidance
Material and workmanship: Approved Document 7
29 November 2018 Statutory guidance
Published 9 April 2010